Papua LNG Integrated FEED Entry
3/7/2023
Santos today announced the Papua LNG joint venture has launched fully-integrated front-end engineering and design (FEED) for the Papua LNG project in Papua New Guinea. Papua LNG is expected to have liquefaction capacity of up to six million tonnes of LNG per annum with first production expected by the end of 2027 or early 2028. Following pre-FEED studies, the Papua LNG partners have selected a concept using four electric LNG trains (e-trains) with a combined capacity of four million tonnes per annum to be developed within the existing PNG LNG project site. Papua LNG has also secured access to up to two million tonnes of existing liquefaction capacity from PNG LNG. Integrating the Papua LN
